You are here

Re­hab­ili­tation and Heightening of the Cambambe arch dam

Cambambe Arch Dam (H = 60 m; 180 MW) was completed in 1962 and has been operating successfully since then.
The ongoing heightening of the dam by 28 m will increase the capacity and the energy production. Together with the dam heightening, the spillway system is rehabilitated and adapted to the new site conditions.

Services

Technical assistance, Engineering and design,

Contact

 

Stucky SA

Stucky AG
Rue du Lac 33
1020 Renens
Switzerland
T +41 21 637 15 13
F +41 21 637 15 08
Contact Person
Dr. Stefan Mützenberg
T +41 21 637 15 32
obfuscationXfuncsmuetzenberg@stobfuscationXfuncucky.ch
Dr. Stefan Mützenberger