You are here

Technical screening and Due-Diligence studies for var­i­ous HEPP`s

Turkey

Assessment and analysis of various HEPP projects, which are under operation, construction and planning phases. These projects include Yigit (21 MW), Caglar (20 MW), Burma (14 MW), Dogancay (47 MW), Ahali (47 MW), Uzundere (21 MW), Yüzüncüyil (18 MW), Pirinclik and Aksu (15 MW).
Review and assessment of the pre-feasibility studies. Assessment of the hydrological data and analysis; Review of geological conditions and confirmation of acceptability of the study. Assessment of completeness of study and identification of missing items (for example seismic risk assessment, locations of construction materials, access conditions etc.). Technological Risk. Assessment and potential improvements of civil works and construction methods, equipment, transmission and power interconnection. Assessment of power generation capacity and production. Conclusions of feasibility. Construction schedule assessment and update. Economic and financial analysis.

Service
General layout and topography check, geological conditions, hydrology, energy production analysis, checking of the Civil, HM and EM design documentation, energy transmission lines and project accessibility. Hazard and seismic rick assessment and verification. Optimisation and identification of the most favourable option. Cost Estimates, technico-economical analysis, IRR for various options, site visit.
 

Contact

 
Stucky Teknik Eng. & Cons. Comp. Ltd
Cevizlidere Cad. Arikan Apt. No: 54/11
06520 Balgat Cankaya Ankara
Turkey
T +90 312 287 12 01
F +90 312 286 26 23
Contact Person
Hacer Erdem Alptekinoglu
T +90 3122 87 12 0
obfuscationXfunchaerdem@stobfuscationXfuncucky.ch
Hacer A. Erdem, Stucky Teknik Eng. & Cons. Comp. Ltd, Gruner Gruppe