At Switzerland’s oldest geothermal power plant, deepwater at a temperature of 65°C is pumped from 1,547 m below ground level. The water is cooled down to a temperature of 25°C by heat pumps and the thermal energy fed into a district heating system. The spent water is then pumped directly back into the ground through a 1,247 m deep injection well.