You are here

Action plan­ning for Stallikon

Natural hazard maps showing built-up areas that are at risk from flooding, landslips or rockfalls have been prepared for numerous municipalities. The next step is to implement measures to eliminate or mitigate the hazards. Gruner Böhringer AG provides support in developing holistic and sustainable solutions for the protection of affected (municipal) areas. For the municipality of Stallikon, the damage potential posed by natural hazards was determined for the situation before and after the proposed action. The most suitable protective works were then selected on the basis of a cost-benefit analysis. These measures are now being undertaken by the municipality in line with the prepared schedule.