Energy

This 670 MW power plant, commissioned in 2013 is a large underground complex composed of several cavern, the largest one being the powerhouse (L = 120 m, B = 20 m, H = 43 m). It is connected to the scheme through four tailrace tunnels, 75 m long each with a 12 m excavated diameter

Services

Construction engineering (EPC)