You are here

Con­struc­tion of the new Muttsee dam

Glarus Alps

The Muttsee dam in the Glarus Alps will retain the upper reservoir of the new 1,000-MW "Linthal 2015" pumped-storage hydropower plant. Built from 68 concrete blocks, the 1,050 m gravity wall will be one of the longest in Europe and will triple the capacity of the Muttsse reservoir at 25 millions m3. Acting as part of an engineering consortium, Stucky Ltd was appointed to design this exceptional structure and supervise the on-site works.

Contact

 

Stucky SA

Stucky SA
Rue du Lac 33
1020 Renens
Switzerland
T +41 21 637 15 13
F +41 21 637 15 08
Contact Person
Dr. Stefan Mützenberg
T +41 21 637 15 32
obfuscationXfuncsmuetzenberg@stobfuscationXfuncucky.ch
Dr. Stefan Mützenberger