You are here

Infrastructure

Roche, Basel

Infrastructure

Roche, Basel

Infrastructure

Geo­tech­nical engi­neer­ing and excavation for Roche project

F. Hofmann-La Roche Ltd is extending and renovating the building infrastructure at its existing Basel site and will be realizing a new research and development center in the next ten years. The two high-rises—Building 1 and Building 2—plus a total of eight other new office and laboratory buildings which will replace the older structures on the existing industrial site, should enable the company to concentrate its employees at a single location.

Gruner Ltd has been commissioned to conduct engineering services including geotechnical engineering and excavation for Buildings 8 and 11, which have been designed by architects Herzog & de Meuron. The basement level, which will extend below the water table, will require excavations between 22 and 26 meters deep, braced at several points, with a floor area of approximately 4,000 m2.

Contact

 
Gruner AG
Gellertstrasse 55
4020 Basel
Switzerland
Contact Person
Laurent Pitteloud
T +41 61 317 63 76
obfuscationXfunc Laurent.Pitteloud@grobfuscationXfuncuner.ch
Laurent Pitteloud, Dipl. Bauingenieur ETHZ