Alimit HEPP, Philippines

Energy

Alimit HEPP, Philippines

Energy

Alimit HEPP, Philippines – Stucky wins fea­sibi­lity study mandate

Sited on the Luzon archipelago in the Philippines, the 250 MW pumped-storage hydropower plant consists of various reservoirs, diversion channels, dams and hydropower plants. The installation consists of an 80 m-high dam on the Alimit River, which provides a 193 million cubic-meter reservoir to power one 125 MW hydropower plant, and two 125 MW Francis turbines accommodated in a powerhouse cavern.

In addition, an 8-km diversion tunnel with a 12 MW power plant to bridge the height difference feeds water into the Alimit reservoir from the Ibulao River, which flows at a higher altitude than the Alimit. A further higher-altitude reservoir between the Alimit and Ibulao Rivers is connected to the lower reservoir via a steel and concrete-lined high-pressure penstock tunnel.
In 2014, Stucky conducted prefeasibility studies for the pumped-storage and diversion scheme, and has now been commissioned to perform the feasibility studies for the entire hydropower complex.


 

Contact

 
Stucky AG
Rue du Lac 33
1020 Renens
Switzerland
Contact Person
Patrice Droz
T +41 21 637 15 40
obfuscationXfuncpdroz@stobfuscationXfuncucky.ch
Patrice Droz