You are here

HPP

Buk Bijela and Foca hydropower schemes

The HPP Buk Bijela and HPP Foca are a part of the upstream hydropower storage and power generation scheme to be constructed on the Drina River.
The Buk Bijela concrete gravity dam shall be 57 high and include a 90 MW run of river plant equipped with Kaplan turbines.
The Buk Bijela concrete gravity dam shall be 43 high and include a 44 MW run of river plant equipped with Bulb turbines.

Services

Preliminary design with hydraulic test model and feasibility study

Contact

 
Stucky Balkans d.o.o.
Boulevard Mihajla Pupina 115E/VI Floor
RS-11070 Belgrad
Serbia
T + 381 11 785 65 90
F +381 11 311 05 11
Contact Person
Vladimir Sumarac
T + 381 11 785 65 90
obfuscationXfuncvsumarac@stobfuscationXfuncucky.ch
v_sumarac