Rerouting Combined Sewer Line Following Bridge Con­struc­tion by Deutsche Bahn

In the course of the renovation of a railway bridge, the existing DN 1200 combined sewer pipeline located next to the bridge abutment had to be rerouted. In 2016, Gruner GmbH carried out the planning and construction supervision for the rerouting on behalf of the Leipzig waterworks. After the bridge renovation is completed, the combined sewer line will be returned to its original position.

Client: Leipziger Wasserwerke