News
May 21, 2026
Pedestrian and bicycle bridge installed over the A2 in just 30 minutes
The motorway in Härkingen was closed for only half an hour during the installation – here is how the challenging overnight operation was successfully carried out. Gruner was responsible for the planning and local site supervision of the bridge construction, roadworks, and civil engineering works.
May 12, 2026
Components from deconstruction projects now live in the Gruner ReUse eShop
With Gruner ReUse, components from existing buildings are digitally recorded and made visible online even before dismantling begins. Numerous elements from the Roche project have now been published in the eShop – and can be reserved directly.