Retention basin fire | References | Gruner AG

Retention basin fire

As part of the Langete flood protection project, the Brand retention basin was built above the Rohrbach settlement area. The following elements were part of the flood protection project: retention basin (volume 120,000 m3), concrete barrier as final structure (length 44m, max. height 10m), throttle outlet, emergency outlet and stilling basin with counter sill and upstream alluvial rake made of steel, lateral earth dam, ecological upgrading of the channel above the barrier by a structured log set and deadwood installation. 

Einwohnergemeinden Huttwil, Rohrbach und Madiswil

Hydraulic engineering

BACK TO OVERVIEW

Your contact person

Marc Frutiger
Head of Department Urban, municipal civil engineering
+41 31 544 24 55 | bWFyYy5mcnV0aWdlckBncnVuZXIuY2g=

Gruner AG
Industriestrasse 1
CH-3052 Zollikofen

References on the subject

Construction of the new Muttsee dam, Glarus Alps
Port Buochs (NW)
Enguri Hydrology Initiative
Heightening of the Vieux Emosson arch dam
Revitalization Wiese