Cambambe arch dam

Re­hab­ili­tation and Heightening

Cambambe Arch Dam (H = 60 m; 180 MW) was completed in 1962 and has been operating successfully since then.


The ongoing heightening of the dam by 28 m will increase the capacity and the energy production. Together with the dam heightening, the spillway system is rehabilitated and adapted to the new site conditions.