Bau der Staumauer Mutsee

Construction of the new Muttsee dam, Glarus Alps

Construction of the new dam

The Muttsee dam in the Glarus Alps will retain the upper reservoir of the new 1,000-MW "Linthal 2015" pumped-storage hydropower plant. Built from 68 concrete blocks, the 1,050 m gravity wall will be one of the longest in Europe and will triple the capacity of the Muttsse reservoir at 25 millions m3. Acting as part of an engineering consortium, Stucky Ltd was appointed to design this exceptional structure and supervise the on-site works.

Energy,
Hydropower

BACK TO OVERVIEW

Your contact person

Stefan Mützenberg
Member of the Executive Committee, Head of Business Area Energy
+41 21 637 15 32 | c3RlZmFuLm11ZXR6ZW5iZXJnQGdydW5lci5jaA==

Stucky AG
Rue du Lac 33
CH-1020 Renens VD 1

Brendan Quigley
Head of Hydropower, Dams
+41 21 637 15 72 | YnJlbmRhbi1tYXJ0aW4ucXVpZ2xleUBzdHVja3kuY2g=

Stucky AG
Rue du Lac 33
CH-1020 Renens VD 1

References on the subject

Hydroelectric power station Enguri, Georgia
SALANFE dam
Installation of steam turbine system