Rehabilitation tunnel Belchen Inert material landfill Fasiwald

The rehabilitation of the Belchen tunnel between Eptingen (BL) and Hägendorf (SO) on the A2 national road was a complex construction project that affected a large number of environmental areas. For the excavated material, an inert material landfill was operated in the project perimeter in order to minimize transports and thus the impact on air pollution control.

During the regular UBB inspections, the implementation of the official requirements from the approval process of the construction project regarding the following environmental areas was checked and implemented, the contractor and the construction management were advised if necessary, and all measures were documented in detail:

> Air pollution control

> Water pollution control

> Soil protection and archaeology

> Nature conservation and landscape

> Noise protection and vibrations

UVEK; Bundesamt für Strassen ASTRA, Filiale Zofingen

Environmental construction supervision

Referenzblatt

BACK TO OVERVIEW

Your contact person

Alexsandra Brendle
Project manager
T +41 43 299 74 66 | YWxleHNhbmRyYS5icmVuZGxlQGdydW5lci5jaA==

Gruner AG
St. Jakobs-Strasse 199
CH-4020 Basel

Yves Schachenmann
Head of Environment
+41 61 317 61 59 | eXZlcy5zY2hhY2hlbm1hbm5AZ3J1bmVyLmNo

Gruner AG
St. Jakobs-Strasse 199
CH-4020 Basel