At the Wiese in the urban environment near Basel, revitalization and flood protection measures were carried out on 1.5 km (from the mouth into the Rhine). The new channel structuring was carried out with stone and wooden and funnel groynes, islands and fascines. Longitudinal passability was created with basin ravines and bar ramps. The recreation area was upgraded with new seating steps. 