December 23, 2021

New Head of Business Unit Structural design Zurich, Brugg

Since December 1, 2021, Ivan Jovanic leads the Gruner Business Unit Structural design Zurich, Brugg. 

On December 1, 2021, Ivan Jovanic took over as Head of the Business Unit Structural design Zurich, Brugg. Ivan Jovanic, a graduate civil engineer ETHZ with an NDS industrial engineering FH, has been with Gruner for almost 18 years and was most recently Deputy Head of the BU. In his career, Ivan gained extensive knowledge and experience in managing new construction and reconstruction projects. In the process, he developed important partnerships, took over the acquisition of building construction and civil engineering projects, and continuously developed structural engineering.

With the internal succession solution, all projects can be continued without delays.

We look forward to continuing our cooperation with Ivan Jovanic.

 

 

Ivan Jovanic

Ivan Jovanic

You might also be interested in

May 27, 2026

Gruner expands its range of fire safety courses – secure your spot now!

New regulations, increasingly complex buildings and rising safety requirements: fire safety is constantly evolving. Gruner is responding with an expanded range of practical fire safety courses in Switzerland. The focus is on specialist topics such as BSV-2026, fire control systems and smoke extraction systems, as well as fire safety solutions for timber construction and existing buildings.

May 26, 2026

From Training Centre to Housing: Re-Use as a Design Principle for Sustainable Construction

In Arlesheim (BL), the former Baloise training centre is being transformed into around 64 rental apartments. The Hagenbündten project, currently under construction, demonstrates how consistent re-use strategies can create sustainable housing within existing structures.

May 21, 2026

Bridge installed over the A2 in just 30 minutes

Gruner was responsible for the design and construction management of the new pedestrian and cyclist bridge in Härkingen in the fields of bridge engineering, road construction and civil engineering. For the bridge lift, the A2 motorway was closed for just 30 minutes – a glimpse into a demanding night-time operation.