Schulhaus Erlenmatt

The project is a new construction of a primary school building with kindergarten and sports hall. The building comprises 2 basement floors, one entrance floor and 5 upper floors. The sports hall is located on the two basement floors and extends to the entrance floor. The dead weight of the floor slabs is reduced by hollow bodies. The hall ceiling is designed as a support structure with pre-stressed precast girders. Dilatation joints were largely dispensed with in the in-situ concrete façade made of white cement.
Due to the limited space available, the excavation pit was secured with nail walls, bored pile walls and underpinning of the neighbouring buildings. The building is certified according to Minergie-P-Eco.

Kanton Basel-Stadt, Hochbauamt

Kanton Basel-Stadt, Hochbauamt

Luca Selva AG, Basel

Structural engineering

BACK TO OVERVIEW

Your contact person

Sandro Brunella
Head of Buildings Northwestern Switzerland
+41 61 317 63 95 | c2FuZHJvLmJydW5lbGxhQGdydW5lci5jaA==

Gruner AG
St. Jakobs-Strasse 199
CH-4020 Basel

References on the subject

Neubau
Engineering methods in fire protection and structural design
Office building Zurich
Schoren Hochhäuser, Basel
Coop Neu­bau Produktionszentrum Pratteln