Roche Building 10, Basel

Gruner Ltd has been awarded a further project connected with the renewal and extension of building infrastructure at F. Hoffmann-La Roche Ltd. Gruner was commissioned by Drees & Sommer, Basel, to provide the geotechnical engineering and excavation design services for Building 10 as previously for Buildings 8 and 11, Roche's new office and service block. 

Constructing the new building involves demolition of the existing Building 57 and excavation of an approx. 80 m-long, 45 m-wide and 13 m-deep pit. 

The pit adjoins a residential area on one side and existing Roche buildings on two other sides. At those locations where the pit is directly bounded by existing structures, the excavation concept provides for an underpinning wall tied back by four rows of anchors. Where no buildings stand directly at the pit edge, the retaining structure takes the form of a soldier pile wall tied back by three rows of anchors. The tight deadlines demand the utmost flexibility on the part of both the designers and – due to the many works that need to be performed concurrently – the site supervision and contractor team.

Gruner Ltd services: 

Concept design, detailed design, tendering procedure and production information for excavations, overall site supervision for demolitions and excavations. Design and dimensioning for basement retaining structure (underpinning and soldier pile wall), anchors and micropile crane foundations. Design of fast-tracking measures (jet-grouted underpinning and use of existing basement anchors).

Hoffmann-La Roche AG

Geotechnical engineering and foundation

BACK TO OVERVIEW

Your contact person

Laurent Pitteloud
Head of Geotechnical Engineering
+41 61 317 63 76 | bGF1cmVudC5waXR0ZWxvdWRAZ3J1bmVyLmNo

Gruner AG
St. Jakobs-Strasse 199
CH-4020 Basel

References on the subject

Road tunnel in the vicinity of a recent slope slide
Competence Center for Industry 4.0
ASTRA N1, Zurich northern bypass, cut-and-cover Tunnel Katzensee, retaining walls, foundations, excavation pits
SBB, Railway line CEVA, Geneva
Automated optimization of retaining walls for excavation pit