Re­hab­ili­tation and Heightening of the Cambambe arch dam

Cambambe Arch Dam (H = 60 m; 180 MW) was completed in 1962 and has been operating successfully since then.
The ongoing heightening of the dam by 28 m will increase the capacity and the energy production. Together with the dam heightening, the spillway system is rehabilitated and adapted to the new site conditions.

Services

Technical assistance, Engineering and design,