Installation of steam turbine system

Novartis Werk Schweizerhalle (WSH)

Installation of steam turbine system (4.9 MW) in steam distribution network. The turbine is fed by three steam boilers (two waste/solvent incinerators, one oil-fired boiler). Integration of generator into medium-voltage network at WSH both as single power source and as secondary power source feeding into grid. The project also included refurbishment of the building’s steam distribution and seismic safety systems.

Energy,
Power systems,
Energy transfer,
Geothermal systems,
Pipeline engineering,
Hydropower

BACK TO OVERVIEW

References on the subject

Benin and Togo
Hydroelectric power station Enguri, Georgia
The Circle, Zurich
SALANFE dam