Mühleteich Riehen | References | Gruner AG

Mühleteich Riehen

Reconstruction of bridge, new construction of embankment walls

In order to improve the flow, the civil engineering office of Basel wanted the bridge over the Mühleteich to be rebuilt. The supporting structure was to be retained. By removing the median wall, the risk of clogging was to be reduced. For this purpose, the existing two-span continuous girder support system had to be converted into a single-span system. Using shape memory reinforcement (re-fer), the structure was prestressed to avoid deformations and cracks due to load redistribution and to increase the load-bearing capacity accordingly.
increase.

Furthermore, existing bank walls were replaced with reinforced concrete structures as part of the project.

Services:

> deconstruction

> excavation support

> structural design

> consulting

TBA-Basel Stadt

Structural maintenance,
Structural engineering

Referenzblatt

BACK TO OVERVIEW

Your contact person

Gernot Hörtnagl
Project manager
+41 61 317 61 57 | Z2Vybm90LmhvZXJ0bmFnbEBncnVuZXIuY2g=

Gruner AG
St. Jakobs-Strasse 199
CH-4020 Basel

References on the subject

Neubau Werkareal BVB
Konapharma Pratteln
Engineering methods in fire protection and structural design
Schulhaus Erlenmatt
Bossard Arena and "Uptown", Zug