Hydraulic engineering | Services | Gruner AG

Hydraulic engineering
Sustainable use and hazard control as two sides of the same coin

We carry out improvements to hydraulic structures and develop safety concepts for flood control. We renaturalize watercourses and restore covered streams to their original state, always giving due consideration to the wider environmental context. This is because water, as a natural resource, can be both a blessing and a curse. On the one hand, it is needed for drinking and a variety of other purposes, and also provides a sustainable means of clean energy production. On the other hand, we need to control the risks posed by water while at the same time preserving the ecological equilibrium.

Picture: Revitalization Wiese

Your contact person

Markus Doessegger
Head of Infrastructure Zurich, Brugg
+41 56 460 69 20 | markus.doessegger@gruner.ch

Gruner AG
Altenburgerstrasse 4
CH-5200 Brugg

Adrian Baumgartner
Head of the Degersheim branch office
+41 71 372 50 11 | adrian.baumgartner@gruner.ch

Gruner Schweiz AG
Taastrasse 1
CH-9113 Degersheim

Thomas Michaud
Head of the Water and Environment Department
+41 21 637 14 49 | thomas.michaud@gruner.ch

Gruner Stucky SA
Rue de la Gare de Triage 5
CH-1020 Renens VD 1

Michael Aggeler
Head of the Water Department
+41 61 406 13 11 | michael.aggeler@gruner.ch

Gruner AG
Mühlegasse 10
CH-4104 Oberwil

Marc Frutiger
Head of Department Urban, municipal civil engineering
+41 31 544 24 55 | marc.frutiger@gruner.ch

Gruner Schweiz AG
Industriestrasse 1
CH-3052 Zollikofen

Reto Gysin
Deputy Head of Hydraulic Engineering / Sanitary Engineering
+41 41 748 20 89 | reto.gysin@gruner.ch

Gruner AG
Chamerstrasse 170
CH-6300 Zug

Dirk Göbbels
Head of Infrastructure Zurich
+41 43 299 74 90 | dirk.goebbels@gruner.ch

Gruner AG
Thurgauerstrasse 80
CH-8050 Zürich

CONTACT FORM

References on the subject

Enguri Hydrology Initiative
Partial expansion of Bünz, Wohlen (AG)
Fish migration
Heightening of the Vieux Emosson arch dam
Construction of the new Muttsee dam, Glarus Alps
Expansion Dorfbach
Retention basin fire
Revitalization and flood protection Alte Aare
Conversion / extension, Rüti (ZH)
Zwingen Birs
Revitalization Wiese
Port Buochs (NW)
Jinvali dam and hydropower plant - Tunnel rehabilitation
Nurek dam and hydropower rehabilitation project
At Bashy hydropower rehabilitation project
Renaturation Tobelbach and Bibersee, Cham (ZG)
Zurich Airport, Glatt
River remediation works in Montpreveyres