Hydraulic engineering | Services | Gruner AG

Hydraulic engineering
Sustainable use and hazard control as two sides of the same coin

We carry out improvements to hydraulic structures and develop safety concepts for flood control. We renaturalize watercourses and restore covered streams to their original state, always giving due consideration to the wider environmental context. This is because water, as a natural resource, can be both a blessing and a curse. On the one hand, it is needed for drinking and a variety of other purposes, and also provides a sustainable means of clean energy production. On the other hand, we need to control the risks posed by water while at the same time preserving the ecological equilibrium.

Picture: Revitalization Wiese

Your contact person

Markus Doessegger
Head of Infrastructure Zurich, Brugg
+41 56 460 69 20 | markus.doessegger@gruner.ch

Gruner AG
Altenburgerstrasse 4
CH-5200 Brugg

Adrian Baumgartner
Head of the Degersheim branch office
+41 71 372 50 11 | adrian.baumgartner@gruner.ch

Gruner Schweiz AG
Taastrasse 1
CH-9113 Degersheim

Stéphanie André
Head of the Water and Environment Department
+41 21 637 15 43 | stephanie.andre@gruner.ch

Gruner Stucky SA
Rue de la Gare de Triage 5
CH-1020 Renens VD 1

Michael Aggeler
Head of the Water Department
+41 61 406 13 11 | michael.aggeler@gruner.ch

Gruner AG
Mühlegasse 10
CH-4104 Oberwil

Marc Frutiger
Head of Department Urban, municipal civil engineering
+41 31 544 24 55 | marc.frutiger@gruner.ch

Gruner Schweiz AG
Industriestrasse 1
CH-3052 Zollikofen

Reto Gysin
Deputy Head of Hydraulic Engineering / Sanitary Engineering
+41 41 748 20 89 | reto.gysin@gruner.ch

Gruner AG
Chamerstrasse 170
CH-6300 Zug

Dirk Göbbels
Head of Infrastructure Zurich
+41 43 299 74 90 | dirk.goebbels@gruner.ch

Gruner AG
Thurgauerstrasse 80
CH-8050 Zürich

CONTACT FORM

References on the subject

Heightening of the Vieux Emosson arch dam
Construction of the new Muttsee dam, Glarus Alps
Nurek dam and hydropower rehabilitation project
Zurich Airport, Glatt
Retention basin fire
Renaturation Tobelbach and Bibersee, Cham (ZG)
Port Buochs (NW)
Expansion Dorfbach
Partial expansion of Bünz, Wohlen (AG)
Zwingen Birs
Fish migration
Conversion / extension, Rüti (ZH)
Revitalization and flood protection Alte Aare
Jinvali dam and hydropower plant - Tunnel rehabilitation
Revitalization Wiese
Enguri Hydrology Initiative