Hydraulic engineering
Sustainable use and hazard control as two sides of the same coin

We carry out improvements to hydraulic structures and develop safety concepts for flood control. We renaturalize watercourses and restore covered streams to their original state, always giving due consideration to the wider environmental context. This is because water, as a natural resource, can be both a blessing and a curse. On the one hand, it is needed for drinking and a variety of other purposes, and also provides a sustainable means of clean energy production. On the other hand, we need to control the risks posed by water while at the same time preserving the ecological equilibrium.

Picture: Revitalization Wiese

Your contact person

Markus Doessegger
Head of Infrastructure Zurich, Brugg
+41 56 460 69 20 | markus.doessegger@gruner.ch

Gruner AG
Altenburgerstrasse 4
CH-5200 Brugg

Adrian Baumgartner
Head of the Degersheim branch office
+41 71 372 50 11 | adrian.baumgartner@gruner.ch

Gruner Schweiz AG
Taastrasse 1
CH-9113 Degersheim

Stéphanie André
Head of the Water and Environment Department
+41 21 637 15 43 | stephanie.andre@gruner.ch

Gruner Stucky SA
Rue de la Gare de Triage 5
CH-1020 Renens VD 1

Michael Aggeler
Head of the Water Department
+41 61 406 13 11 | michael.aggeler@gruner.ch

Gruner Böhringer AG
Mühlegasse 10
CH-4104 Oberwil

Sascha Brand
Team leader Maintenance management and engineering
+41 31 544 24 33 | sascha.brand@gruner.ch

Gruner Schweiz AG
Industriestrasse 1
CH-3052 Zollikofen

Reto Gysin
Deputy Head of Hydraulic Engineering / Sanitary Engineering
+41 41 748 20 89 | reto.gysin@gruner.ch

Gruner Berchtold Eicher AG
Chamerstrasse 170
CH-6300 Zug

Dirk Göbbels
Head of Infrastructure Zurich
+41 43 299 74 90 | dirk.goebbels@gruner.ch

Gruner Schweiz AG
Thurgauerstrasse 80
CH-8050 Zürich

CONTACT FORM

References on the subject

Retention basin fire
Revitalization Wiese
Zurich Airport, Glatt
Revitalization and flood protection Alte Aare
Expansion Dorfbach
Conversion / extension, Rüti (ZH)
Jinvali dam and hydropower plant - Tunnel rehabilitation
Partial expansion of Bünz, Wohlen (AG)
Renaturation Tobelbach and Bibersee, Cham (ZG)
Port Buochs (NW)
Fish migration
Zwingen Birs